Ambassador Bridge Enhancement Project CBSA Truck Inspection Building – Add#8

Addendum #8 added 04/23/2025

Addendum #7 added 04/15/2025

Addendum #6 added 04/10/2025

Addendum #5 added 04/08/2025

Addendum #4 added 04/02/2025

Addendum #3 added 03/21/2025

Addendum #2 added 03/04/2025

Addendum #1 added 02/13/2025

Proposed Truck Plaza Inspection Building 2

floors with Service Basement

Building Area First Floor 35,004 Square feet ( Warehouse Area: 22,216 SQFT)

Building Area Second Floor 35,725 Square feet

Building Area Basement 2,464 Square feet

Total Area: 73,193 Square feet

construction start date expected summer 2025 with a 2 year long duration

PLEASE SEND ALL RFIs AS per instructions in the tender documents

LCBO – Level 2 Refresh, Store 34-Windsor – Updated (Addendum 1)

The scope of work is to supply construction labour and materials for a level 2 refresh at existing LCBO store 34, in Windsor, Ontario as per enclosed drawings and specifications.

Start date April 21st, 2025. End date May 9th, 2025.

Addendum 1 UPDATED Feb 21st, 2025