Showing all 5 results
2024-360 University of Windsor Centre of Engineering Innovation Suite 3088 Renovations
The work is identified as the Research Suite 3088 Renovations located at CEI Building, University of Windsor, Windsor, Ontario, also known as Project 2024-36. In general the scope of work includes but is not limited to: Relocation of exiting furniture, new walls, doors, electrical and data.
Barry Callebaut Canada BC Chatham Wash Bays Renovations
Selective demolition of existing storage rooms and Wash Bay. Construction of New Wash Bays construction will be performed using masonry block wall construction with poured concrete on steel pan for ceiling.
Chatham Kent Health Alliance Main Entrance Renovation
This RFT is issued by Mohawk Medbuy Corporation ONWest (Formerly Transform Shared Service Organization) for the purpose of obtaining Proposals for Main Entrance Construction for Chatham Kent Health Alliance 80 Grand W, Chatham, ON N7L 1B7.
Renovations to – École Secondaire Catholique de Pain Court – Addendum #1, #2, #3, #4, #5, #6
Work of this Contract comprises renovations of École Secondaire Catholique de
Pain Court, located at 14 Notre Dame Street, Pain Court, Ontario; and identified
as Project No. 24009.
Addendum #1 – Dated Nov. 1/24
Addendum #2 – Dated Nov. 12/24
Addendum #3 – Dated Nov. 13/24
Addendum #4 – Dated Nov. 14/24
Addendum #5 – Dated Nov. 14/24
Addendum #6 – Dated Nov. 18/24
Under Sun Acres Warehouse Office Building and Bunkhouses – phase 6 – Revised Drawings Nov.13-24
Tender is based on drawings from a previous similar project.
Phase 6 – consists of the construction of a 122m Warehouse with offices as well as 1 x 60 bed bunk house.
Adjustments to provided drawings:
Warehouse with office: the building length will be (400ft) (350ft.) instead of 500 400ft. (as per provided revised dwgs Nov. 13-24) by removing 6 4 typical 25′ bays. (i.e. remove all work from gridline 4 to gridline 8. Included in this work will be 4 loading docks with all required hardware. Client is requesting all new construction to match in appearance all previous construction. (See photos).
Bunkhouses) see revised dwgs Nov-13-24 to meet client’s required (60) person living area, remove one (1) bay of bedrooms (i.e. Bedrooms 2 and 6) Also this will be 2 bunkhouses end to end but will be mirror images of each other. Client is again requesting that all new construction to match all previous construction. (See photos)
Any questions please forward to estimating@tciwindsor.com by 10:00am on Friday, November 15/24
When pricing please break out as follows:
- Bunk house related work
- Warehouse & Office related work
- See Revised Drawings Nov.13-24