LiUNA!625 Training Centre Addition & New Training Building

LiUNA 625 secured Archon Architects Incorporated to prepare full architectural and engineering documents, drawings and specifications, for two improvements (Building A&B to the site located at 2155 Fasan Drove Oldcastle, Ontario.  The first component, Building “A” includes an addition to the existing training centre and office building.  The addition is located directly attached west of the existing training centre and office building.  The second component, Building “B” is a standalone, pre-engineered building located in the northeast corner of the property, directly adjacent to an existing storage building and connected through a new link building, also part of this project, connecting the existing storage building to the new training building.

The exiting training centre & office building is a single storey, slab on grade, totalling approximately 2,080 sq. ft.  The building will use conventional construction materials, methods and is intended to be an extension of the current training space located directly adjacent to it.  Fully designed and engineered drawings are provided for this component.

The new training building is a double-height single storey, slab on grade and granular pit, pre-engineered building with mono-sloped roofs totalling approximately 6,260 sq. ft. including interior storage rooms with a mezzanine space for the installation of a swing stage system (provided by the Owner). The new building is composed of two primary sections, the main training building totalling 5,560 sq. ft. and a link building totalling 700 sq. ft.  The intent for this component, link and main building , is for the Construction Manager to solicit quotations for the complete engineering, supply, and then installation from a reputable pre-engineering building supplier to provide both the main and ling buildings structure, roof, metal siding and insulation.  Remaining portions should be undertaken / organized by the selected CM and subtrades although flexibility lies with the CM to confirm scopes the feel is best.

This field is for validation purposes and should be left unchanged.

LiUNA 625 secured Archon Architects Incorporated to prepare full architectural and engineering documents, drawings and specifications, for two improvements (Building A&B to the site located at 2155 Fasan Drove Oldcastle, Ontario.  The first component, Building “A” includes an addition to the existing training centre and office building.  The addition is located directly attached west of the existing training centre and office building.  The second component, Building “B” is a standalone, pre-engineered building located in the northeast corner of the property, directly adjacent to an existing storage building and connected through a new link building, also part of this project, connecting the existing storage building to the new training building.

The exiting training centre & office building is a single storey, slab on grade, totalling approximately 2,080 sq. ft.  The building will use conventional construction materials, methods and is intended to be an extension of the current training space located directly adjacent to it.  Fully designed and engineered drawings are provided for this component.

The new training building is a double-height single storey, slab on grade and granular pit, pre-engineered building with mono-sloped roofs totalling approximately 6,260 sq. ft. including interior storage rooms with a mezzanine space for the installation of a swing stage system (provided by the Owner). The new building is composed of two primary sections, the main training building totalling 5,560 sq. ft. and a link building totalling 700 sq. ft.  The intent for this component, link and main building , is for the Construction Manager to solicit quotations for the complete engineering, supply, and then installation from a reputable pre-engineering building supplier to provide both the main and ling buildings structure, roof, metal siding and insulation.  Remaining portions should be undertaken / organized by the selected CM and subtrades although flexibility lies with the CM to confirm scopes the feel is best.

YOU MAY ALSO BE INTERESTED IN...

2024-360 University of Windsor Centre of Engineering Innovation Suite 3088 Renovations

The work is identified as the Research Suite 3088 Renovations located at CEI Building, University of Windsor, Windsor, Ontario, also known as Project 2024-36.  In general the scope of work includes but is not limited to: Relocation of exiting furniture, new walls, doors, electrical and data.

Chatham Kent Health Alliance Main Entrance Renovation

ICI: Renovation
Healthcare Facility
Scope of Work

This RFT is issued by Mohawk Medbuy Corporation ONWest (Formerly Transform Shared Service Organization) for the purpose of obtaining Proposals for Main Entrance Construction for Chatham Kent Health Alliance 80 Grand W, Chatham, ON N7L 1B7.

Renovations to – École Secondaire Catholique de Pain Court – Addendum #1, #2, #3, #4, #5, #6

Work of this Contract comprises renovations of École Secondaire Catholique de
Pain Court, located at 14 Notre Dame Street, Pain Court, Ontario; and identified
as Project No. 24009.

Addendum #1 – Dated Nov. 1/24

Addendum #2 – Dated Nov. 12/24

Addendum #3 – Dated Nov. 13/24

Addendum #4 – Dated Nov. 14/24

Addendum #5 – Dated Nov. 14/24

Addendum #6 – Dated Nov. 18/24

Under Sun Acres Warehouse Office Building and Bunkhouses – phase 6 – Revised Drawings Nov.13-24

Tender is based on drawings from a previous similar project.

Phase 6 – consists of the construction of a 122m Warehouse with offices as well as 1 x 60 bed bunk house.

Adjustments to provided drawings:

Warehouse with office: the building length will be (400ft) (350ft.) instead of 500 400ft. (as per provided revised dwgs Nov. 13-24) by removing 6 4 typical 25′ bays.  (i.e. remove all work from gridline 4 to gridline 8.    Included in this work will be 4 loading docks with all required hardware.  Client is requesting all new construction to match in appearance all previous construction.  (See photos).

Bunkhouses) see revised dwgs Nov-13-24 to meet client’s required (60) person living area, remove one (1) bay of bedrooms  (i.e. Bedrooms 2 and 6)  Also this will be 2 bunkhouses end to end but will be mirror images of each other.  Client is again requesting that all new construction to match all previous construction.  (See photos)

Any questions please forward to estimating@tciwindsor.com by 10:00am on Friday, November 15/24

When pricing please break out as follows:

  • Bunk house related work
  • Warehouse & Office related work
  • See Revised Drawings Nov.13-24